Pile installation was completed, with bearing capacity verified based on dynamic and static tests. A pile field was formed, ensuring design elevations and tolerances. Work began on the prepared foundation to create a multifunctional space: installing a monolithic grillage, waterproofing, preparing the flooring, and installing utility lines within the concrete.
The facility is designed to accommodate laboratory, administrative, and auxiliary spaces with the ability to adapt the interior layout. All stages were completed in compliance with Rostekhnadzor requirements for nuclear facilities.