Construction of a pile field and creation of a multifunctional space
Pile field, monolithic grillage and engineering preparation
Home / Projects / FSUE Alexandrov NITI Sosnovy Bor
September 2025 - June 2028
FSUE Alexandrov NITI
Sosnovy Bor
A range of preparatory and general construction works have been completed to construct a pile field for a new multifunctional building on the institute's premises.
Implementation deadlines
Description
location
What was implemented
Pile installation was completed, with bearing capacity verified based on dynamic and static tests. A pile field was formed, ensuring design elevations and tolerances. Work began on the prepared foundation to create a multifunctional space: installing a monolithic grillage, waterproofing, preparing the flooring, and installing utility lines within the concrete.

The facility is designed to accommodate laboratory, administrative, and auxiliary spaces with the ability to adapt the interior layout. All stages were completed in compliance with Rostekhnadzor requirements for nuclear facilities.