TechAtomStroy specialists completed the concreting of critical load-bearing and enclosing structures in the reactor complex buildings. The work was carried out in accordance with NP-041-22 and industry safety class standards.
Particular attention was paid to the construction of walls and floors in areas with increased airtightness and radiation protection requirements. Heavy-duty concrete of the design grades was used, and control of placement, vibration compaction, and temperature and humidity curing conditions was ensured. Reinforcement was installed in accordance with design specifications and confirmed by non-destructive testing protocols.